Tonbridge High School

Historic Hall Transformed

Quantity Surveyor Synergy CPC LLP
Architect Orms Architecture Design
Structural Colin Toms & Partners
Services Kehr and Tucker

GPF Lewis was thrilled to be entrusted with the revitalisation of this historic hall. Our goal was to create a versatile, modern space that preserved the building's original character while meeting the needs of its diverse users.

The project involved a comprehensive refurbishment of the hall, including the construction of a new upper gallery and a welcoming entrance foyer. To enhance acoustics and aesthetics, we replaced the existing walls with oak flooring and acoustic panelling. The old floor was carefully removed, and any damaged joints were repaired or replaced. We then installed insulation and a wet underfloor heating system, ensuring both comfort and energy efficiency. The final touch was the installation of a beautifully engineered oak flooring system, adding a touch of elegance to the renovated space.

This project showcases our ability to blend modern design elements with historic preservation. We're proud to have played a role in transforming this iconic hall into a vibrant and functional community asset.