Sector
Commercial
Architect
Steve Nutkins Associates
Price
£250k
Duration
11 Weeks

£250,000 office refurbishment & fit-out project


Programmed to complete over an 11-week period, the premises acquired by Zeon for their new UK Head Offices was in need of a complete refurbishment to bring it to a standard to match their premium brand.
 

The existing offices were stripped out and a new mezzanine floor installed to accommodate office space for up to 70 staff on the 1st floor.   Glazed partitioning with bespoke manifestations were installed to create the reception, 2 showrooms, boardroom and 3 executive offices on the ground floor.
 

The works included suspended ceilings throughout, grid lighting, full electrical re-wire, new fire alarm system, data, AV and A/C including fresh air ducting.  Karndean floors were fitted to the ground floor offices & reception and carpet tiles to the large office space on the 1st floor.
 

The bespoke reception desk was built by our team on site to incorporate 5 large drinks fridges - the unique design and feel leaves a lasting impression.

Crown Aspinalls

Porchester Road

Minerva House

Regents Open
Air Theatre

Perrin II

Perrin III

Great
Marlborough Street

Forbury Court

210 Kingston Road

The
Railway Tavern

Hyde Park
Hotel, London

Willow Place,
London SW1

Del Mercato,
London SE1

The
Ship, Wandsworth

Manchester Square

65 New
Kings Road

Marylebone Project

Mandeville Place

The Hurlingham

Building 2, Maidenhead

Stanmore Hill

DLA
Office Refurb

Aire Spa

Mayfair Office

Hampton Water
Treatment

Holloway Road

International
Red Cross

Manchester Street

Imperial Place