Duration
29 Weeks

Demolition and New Studio & Kitchen Building


Works consist of the following main elements:

  • Isolation and Demolition of Existing Buildings.
  • New design and Construction of a CLT frame & Cladding
  • New flat roof finishes
  • Installation of 1st and 2nd fix components inclusive of finishes
  • Installation of 1st and 2nd fix MEPH services
  • All inclusive of high specification joinery, floor / wall finishing, lighting and suspended ceilings.
  • External landscaping.

Crown Aspinalls

Porchester Road

Minerva House

Perrin II

Perrin III

Great
Marlborough Street

Forbury Court

210 Kingston Road

Zeon,
West London

The
Railway Tavern

Hyde Park
Hotel, London

Willow Place,
London SW1

Del Mercato,
London SE1

The
Ship, Wandsworth

Manchester Square

65 New
Kings Road

Marylebone Project

Mandeville Place

The Hurlingham

Building 2, Maidenhead

Stanmore Hill

DLA
Office Refurb

Aire Spa

Mayfair Office

Hampton Water
Treatment

Holloway Road

International
Red Cross

Manchester Street

Imperial Place