£250,000 office refurbishment & fit-out project


Programmed to complete over an 11-week period, the premises acquired by Zeon for their new UK Head Offices was in need of a complete refurbishment to bring it to a standard to match their premium brand.
 

The existing offices were stripped out and a new mezzanine floor installed to accommodate office space for up to 70 staff on the 1st floor.   Glazed partitioning with bespoke manifestations were installed to create the reception, 2 showrooms, boardroom and 3 executive offices on the ground floor.
 

The works included suspended ceilings throughout, grid lighting, full electrical re-wire, new fire alarm system, data, AV and A/C including fresh air ducting.  Karndean floors were fitted to the ground floor offices & reception and carpet tiles to the large office space on the 1st floor.
 

The bespoke reception desk was built by our team on site to incorporate 5 large drinks fridges - the unique design and feel leaves a lasting impression.

Great
Marlborough Street

210 Kingston Road

Perrin II

The
Railway Tavern

Hyde Park
Hotel, London

Willow Place,
London SW1

Del Mercato,
London SE1

The
Ship, Wandsworth

Manchester Square